Shift Scheduler Continuous ExcelBuild a roster to your specifications with automatic staff allocation, easily | |
Download |
Shift Scheduler Continuous Excel Ranking & Summary
Advertisement
- License:
- Free to try
- Language:
- English
- Price:
- Free to try
- Publisher Name:
- By Bizpep
- Additional Requirements:
- Microsoft Excel
- File Size:
- 374 KB
- Total Downloads:
- 1896
Shift Scheduler Continuous Excel Tags
- asset allocation roster shift shift scheduler Excel allocation highmat specifications Allocation Information Builder allocation scenario staff roster baseball roster system specifications time allocation roster software create roster roster creator make roster Allocation Profile capacity allocation specifications weapon allocation algorithm Risk Allocation Incentive Allocation duty roster
Shift Scheduler Continuous Excel Description
The Shift Scheduler will build a roster structure to your specifications, allocate staff automatically, and generate a printable roster, all at the click of a button. It is compact and user friendly allowing you to add staff and shifts (maximum 150) with ease. Default values for continuous shifts mean that the only shift data required is the start date/time and length for the first shift, everything else is automated. For non-continuous or varying shifts you have the capacity to overwrite default data and structure shift settings to suit your specific requirements. Constraints you can apply when allocating staff include the maximum hours a staff member can work within the roster period, the maximum continuous work hours, the minimum break between shifts, and the maximum number of days in a row that can be worked. In addition, you will have the possibility to set a Yes or No work status whenever you need to define a must or must not work requirement. Your roster is printed using standard Excel commands or using the Format Print function to build a compact and easy to read roster schedule table. The Next Roster function allows you to roll roster details into the next roster period to quickly build consecutive rosters.
Shift Scheduler Continuous Excel Related Software