Gantt Chart Builder System

The Gantt Chart Builder System provides a system to build professional quality Gantt charts
Download

Gantt Chart Builder System Ranking & Summary

Advertisement

  • Rating:
  • License:
  • Demo
  • Price:
  • USD 69.95
  • Publisher Name:
  • Bandwood
  • Operating Systems:
  • Windows All
  • File Size:
  • 10.3 MB

Gantt Chart Builder System Tags


Gantt Chart Builder System Description

GBS requires very little disk space and does not require the user to learn another software package. All Gantt sheets are generated on Excel sheets, this gives the user all the power and flexibility of Excel without the training overheads of battling with Project. Main features: Building the chart itself. This option will allow you to select the desired date bands illustrated below. Clear the chart, Access to the Builder Toolbox. This provides options to automatically populate roll-up tasks and also to automatically mark milestones based on the dates provided. Configure the chart presentation options. See below for a sample view of this control. Print & Print Preview the constructed chart, Copy the selected chart as an image format. This allows the chart to be pasted into almost any other toolset. Export the chart into another external workbook. This creates a sheet that is independent of the GBS toolset.


Gantt Chart Builder System Related Software